The plan for today was to raise the height of the first gap and at 12 noon retire to the Crown Inn in Lofthouse for the NAWG “Christmas Drinks”.  With that incentive the team of five (Barry, Graham, Paul, Roderick and Tony) worked with great enthusiasm.  

 The first through stone is placed 


 
As 12 noon approached it was time to reinstate the stock proof fencing before departing 


Here is a preview of the remaining work on this stretch of wall, to be tackled after the Christmas break  (the next walling day is scheduled for 7 Jan 2015).

 Gap 2


 Gap 3


 Gap 4


 The end of the wall at the edge of the old quarry gorge