Wednesday 25 February 2015

Bewerley Park Outdoor Centre


Our second week at Bewerley Park and numbers were greatly diminished. Two sick notes and a posh lunch preventing a goodly portion of last weeks toilers from attending. So just four of us turned up to play in the mud, which we did with great relish spreading it far and wide. We also allowed some time for plonking some stones down, managing to finish the foundations orf, and add a second course before an early finish at 2.30.

Here are the results:

3 happy wallers enjoying their regulation tea break whilst another take photos



At the end of the day









Grid Ref: SE 16150 64713
Extra Photos: Here

Monday 23 February 2015

Bewerley Park Outdoor Centre - Wednesday 18 February 2015



A new project at an old location. The task is to build a “commemorative” wall to celebrate the 75th anniversary of Bewerley Park from its days as a 'Camp School' in 1940.

The wall will incorporate a stone carved plaque (measuring 20 ins x 20ins) produced by Joseph Hayton, together with 8 smaller plaques (measuring 9 ins x 9 ins) carved by the students at the Bewerley Centre.  The stone to be used for the wall has been sourced from the old demonstration walls.

The view from above showing the locations of the old and new wall


The old demonstration walls were constructed during the Autumn of 2006 and were topped out in January 2007 by the NAONB Walling Group. The wall was dismantled and the stone moved to the location of the new wall by the Tuesday NCVs during September 2014

The design for the new wall has been created by Richard Howard and the schematic below shows how it will look when completed.





The team for today’s activity was Barry, Catriona, Paul, Richard H, Roderick, Roger and Tony.

The task begins by removing the fencing from the bridge end
                        
The safety rope is installed to stop anyone slipping into the stream
Roderick has a couple of admirers of his foundation work
 
Catriona calls coffee break time at the “Pizza Hut”
 
The cutting of the turf begins
 
whilst Catriona, Richard & Roderick start at the barn end


 
Back to the “Pizza Hut” for lunch


Richard and Tony (taking the picture) make a start on the bend

At 3.30pm it is time to wind down for the day



The foundations are nearly complete