 As is often the case all the good stone had been used lower down the wall so the last two courses involved a lot of trimming and shaping.  Then, as predicted, we (Roderick and Duncan) didn’t have enough toppers to finish the wall so we both started looking for buried toppers or stone that could be made into toppers. 

Duncan started attacking a huge three tonne monolith which had a useful looking overhang but gave up after twenty minutes. 

Meanwhile Roderick found a massive buried stone that we managed to lever out. We subsequently broke this into four pieces which allowed us to complete the wall.  The final line of toppers is somewhat uneven but we daren’t trim them in case they split and became unusable.


Wall at the end of last week
 
Rod unearthing a whopper - subsequently made into 4 toppers

More topper material

A finished Gap!