Three teams of two tackled the continuing job at Low Wood Farm on a cold but dry day. Chris & Val laid more courses on their stint below the holly tree, while Rob & Duncan moved massive foundation stones into place on the neighbouring section and added two more hefty courses. Andy & Barry tidied the further section to retain most of the existing wall, and then dismantled the following stint, laying a foundation and a first course. A productive and satisfying day undeterred by flecks of afternoon snow, with a 3pm finish.
Barry S.
No. Wallers: 6