The day looked like it would stay dry long enough to take us past lunch time. The hope was that the brisk wind would keep the rain away.  The team today was Catriona, Graham, Paul, Richard H, Richard P and Tony. 


Paul and Tony get to work at low level
The rest of the team take up their positions 

It was discovered that the cheek end at the beginning of the wall (rebuilt in 2011) had suffered a knock, so Graham and Richard P set about some rectification work.

The position showing  the rebuild  progress at lunch time

Back at the far end of the wall at lunch time
 
The rebuilt cheekend

Graham carries out a final check
 


To avoid the threatening rain a closure notice went up along the wall at 2.30pm
 

 
Paul gives a second opinion on the completed cheekend

 Tony